LM NEWS 24
LM NEWS 24

NCRTC Completes Trial Run Of Delhi-Meerut Namo Bharat Train

National Capital Region Transport Corporation (NCRTC) has successfully completed a scheduled trial run of Namo Bharat trains on the entire Namo Bharat corridor between Delhi’s Sarai Kale Khan and Modipuram in Meerut, covering the full 82 km journey in less than an hour.

During this trial, the Meerut Metro trains also ran alongside Namo Bharat trains, and the system successfully completed its tests. This is a significant milestone in the operation of India’s first Namo Bharat corridor, which is being implemented between Delhi, Ghaziabad, and Meerut.

During the trial, Namo Bharat trains ran seamlessly across the 82 km stretch at their maximum operational speed of 160 km per hour.

The trains halted at every station between Sarai Kale Khan and Modipuram and completed the distance in less than an hour, as per the schedule targeted by NCRTC.

The Namo Bharat corridor is equipped with the world’s first deployment of an advanced ETCS Level 3 hybrid signalling system over an LTE backbone. This signalling system, integrated successfully with platform screen doors (PSDs) installed at every station, successfully completed testing without any interruption, highlighting the system’s readiness.

At present, a 55 km section of the corridor with 11 stations is already operational for passengers. Final finishing works and trial runs are progressing rapidly on the remaining portions — the 4.5 km stretch between Sarai Kale Khan and New Ashok Nagar in Delhi, and the approximately 23 km stretch between Meerut South and Modipuram in Meerut.

This milestone achieved by NCRTC is a significant indicator of progress toward the full commissioning of the Namo Bharat corridor.

Trial runs of the Meerut Metro between Meerut South and Modipuram Depot are also progressing rapidly. This is the first time in the country that local metro services will be provided on the same basic infrastructure as Namo Bharat trains.

The 23 km section of Meerut Metro consists of 13 stations, with 18 km of the route elevated and 5 km underground. (ANI)

0 0 votes
Article Rating
Subscribe
Notify of
guest
0 Comments
Oldest
Newest Most Voted
Inline Feedbacks
View all comments

We use cookies to give you the best online experience. By agreeing you accept the use of cookies in accordance with our cookie policy.

Privacy Settings saved!
Privacy Settings

When you visit any web site, it may store or retrieve information on your browser, mostly in the form of cookies. Control your personal Cookie Services here.

These cookies are essential in order to enable you to move around the website and use its features. Without these cookies basic services cannot be provided.

Cookie generated by applications based on the PHP language. This is a general purpose identifier used to maintain user session variables. It is normally a random generated number, how it is used can be specific to the site, but a good example is maintaining a logged-in status for a user between pages.
  • PHPSESSID

Used on sites built with Wordpress. Tests whether or not the browser has cookies enabled
  • wordpress_test_cookie

In order to use this website we use the following technically required cookies
  • wordpress_test_cookie
  • wordpress_logged_in_
  • wordpress_sec

Decline all Services
Accept all Services
0
Would love your thoughts, please comment.x
()
x